Cataby Project Dust Collector

Iluka Resources

Engineering & Consulting

Project Delivery

Air Pollution Control

Environmental Solutions

Situation

Aerison Pty Ltd was contracted by ILUKA to design, supply, install and commission a Dust Collection System for the North Capel Separation Mill SPC Upgrade Circuit, located approximately 25km south of Bunbury and 4.5km north of Capel.

Solution

Aerison’s service offering included detailed design, drafting and 3D imagery to create a detailed construction methodology. The project collected fugitive dust from the Re-Heater system as well as the materials handling and separation equipment in the SPC baghouse. The waste dust collected from both systems was transferred to a waste hopper and treated before disposal via discharging into waste trucks.

Outcome

The project was delivered on time and on budget.

Gallery